CIN increases productivity by 13% with vaibe

When performance data only arrived the day after, CIN couldn't act on it in time. vaibe changed that across two sites, one of them fully automated.

Back to Case Studies

CIN achieves a 13% productivity increase with vaibe

CIN is a leading manufacturer and distributor of paints and varnishes, founded in Portugal in 1917. With 10 production sites across 3 continents and over 2,000 employees, keeping operations productive and aligned is what keeps the whole business running.

At two key sites, an automated distribution center and a raw materials warehouse, performance was being held back by the same problem: the data existed, but it wasn’t available in time to act on. KPIs were tracked manually and only visible the next day. Equipment downtime relied on estimates. There was no attendance tracking per station. Teams had no real-time view of their own performance.

 

vaibe’s operational performance layer was deployed across both sites, sitting on top of existing systems with no disruption. Daily challenges, real-time public displays, and custom tracking features for downtime, attendance, and work time gave teams and leaders the visibility they needed, when they needed it.

 

Download the full case study to see exactly how vaibe made it happen.

13%

improvement in productivity

+1300

units picked per day

+250

tons shipped per month

100%

employee satisfaction
"We recommend vaibe for its ease of use, tracking capabilities and smooth integration - which we experienced firsthand. It´s ideal for any company looking to improve operational efficiency”.

Isabel Lopes - Operations Manager at CIN

Interested in seeing us in action?

Click the link below and we will follow up soon.
Request Demo